 
					Four major buildings were designed to accommodate the main production line processes to build Malaysia’s National car. Fire Engineering was used in dealing with fire compartmentation, smoke control and egress from the industrial buildings and deliver an efficient open-spaced design for motor vehicle manufacture.
